
Tatweer For Human Resources Company
Supply, Installation, Testing & Commissioning of CCTV Surveillance Systems
A record of work across the Kingdom.
| Azhar Yanbu Compound | Full MEP design | Yanbu, Saudi Arabia | 2026 |
| Playa North Coast Compound | Full MEP design | North Coast, Egypt | 2026 |
| Wadi El Natrun Health Center | Full MEP design | Wadi El Natrun, Egypt | 2026 |
| Azhar Mall – Makkah | HVAC + CFD analysis | Makkah, Saudi Arabia | 2025 |
| Novi LMD | Full MEP design | Saudi Arabia | 2025 |
| SIAC | Electrical design | Saudi Arabia | 2025 |
| AZHAR Al Masar Health Center | Full MEP design | Saudi Arabia | 2025 |
| District Cooling Networks | HVAC + CFD analysis | Egypt | 2025 |
| Smart Power Factory | Electrical design | Egypt | 2025 |
| The King's School Canterbury | Full MEP design | Cairo, Egypt | 2025 |
| Tal3at Harb Club | Full MEP design | Cairo, Egypt | 2025 |
| ElNahwi Textile | Electrical design | Egypt | 2025 |
| United Spinning & Weaving Co. | Electrical design | Egypt | 2025 |
| Ma3had Nasser | Full MEP design | Cairo, Egypt | 2025 |
| Amaala Staff Village – Zone 5 | Full MEP design | Amaala, Saudi Arabia | 2024 |
| Vertical Farm | Full MEP design | Saudi Arabia | 2024 |
| Novi – Women's Workshop | Full MEP design | Saudi Arabia | 2024 |
| DC Towers Iraq | Full MEP design | Iraq | 2024 |
| Joseph District Cooling – Iraq | HVAC + CFD analysis | Iraq | 2024 |
| El Kanater El Khayreya Palace | Full MEP design | Qalyubia, Egypt | 2024 |
| CHINT EGEMAC Factory | Electrical design | Egypt | 2024 |
| U-Venues Mall | HVAC + CFD analysis | Egypt | 2024 |
| ZED Club | Full MEP design | Egypt | 2024 |
| Belle Vie Residence | Full MEP design | Cairo, Egypt | 2024 |
| Ridcon Helio Square Buildings | Full MEP design | Cairo, Egypt | 2024 |
| Redcon Garages Project | Full MEP design | Egypt | 2024 |
| AUC Main Building | Full MEP design | New Cairo, Egypt | 2024 |
| Mercedes Showroom – Smouha | HVAC + CFD analysis | Alexandria, Egypt | 2024 |
| Obour Factory | Electrical design | Obour, Egypt | 2024 |
| Egico KEC Chiller Network | HVAC + CFD analysis | Saudi Arabia | 2023 |
| ACC P6-SEVEN – Jazan | Full MEP design | Jazan, Saudi Arabia | 2023 |
| ACC KAFAD | Full MEP design | Saudi Arabia | 2023 |
| Joseph Ice Cream Factory | Electrical design | Iraq | 2023 |
| Libya Infrastructure | Full MEP design | Libya | 2023 |
| Solution Hospital | Full MEP design | Egypt | 2023 |
| Dorra Cairo Gate – Social Hub | Full MEP design | Cairo, Egypt | 2023 |
| Ridicon Golden Gate | Full MEP design | Egypt | 2023 |
| Bank Masr – Sheikh Zayed Branch | Electrical design | Sheikh Zayed, Egypt | 2023 |
| Islamic Charitable Society | Full MEP design | Egypt | 2023 |
| Go Sport – Cairo Gate | HVAC + CFD analysis | Cairo, Egypt | 2023 |
| Dar El-Asnan Dental Clinic | HVAC + CFD analysis | Egypt | 2023 |
| Youth Center Swimming Pool – Zeinhem | Plumbing & firefighting | Cairo, Egypt | 2023 |
| National Museum of Egyptian Civilization | Full MEP design | Cairo, Egypt | 2022 |
| ACC MASSAR BS02 Tower | Full MEP design | Saudi Arabia | 2022 |
| JO Iraq Media Office Building | Full MEP design | Iraq | 2022 |
| Elmarakby Steel – 6th October Factory | Electrical design | 6th October, Egypt | 2022 |
| Porsche Center – Marassi | HVAC + CFD analysis | North Coast, Egypt | 2022 |
| Tiba Rose Hotel | HVAC + CFD analysis | Egypt | 2022 |
| Hyundai Power Company | Electrical design | Egypt | 2022 |
| Capital Business Park – B05 | Full MEP design | New Cairo, Egypt | 2022 |
| Edge Kuwait Restaurant | HVAC + CFD analysis | Kuwait | 2022 |
| Town Gas Network | Plumbing & firefighting | Egypt | 2022 |
| Kholy Hospital – Saudi Arabia | Full MEP design | Saudi Arabia | 2021 |
| Gaber Administration Building | Full MEP design | Saudi Arabia | 2021 |
| Badr University | Full MEP design | Badr City, Egypt | 2021 |
| Zagazig University – Pillars | Full MEP design | Zagazig, Egypt | 2021 |
| Al-Azhar University – MEP | Full MEP design | Cairo, Egypt | 2021 |
| Triumph Hotel – VIP Hall | HVAC + CFD analysis | Egypt | 2021 |
| Edge Mall Masr | HVAC + CFD analysis | Egypt | 2021 |
| Pillars Hotel | HVAC + CFD analysis | Egypt | 2021 |
| Dorra CRC – Villa 44 | Full MEP design | Cairo, Egypt | 2021 |
| Edge Kuwait Shop | HVAC + CFD analysis | Kuwait | 2021 |
| Arabic Foundation Chamber of Commerce | Full MEP design | Egypt | 2021 |
| Nour Anpix Factory | Electrical design | Egypt | 2021 |
| Egyptian Museum – Site Supervision | Site supervision | Cairo, Egypt | 2020 |
| Bank Masr | Electrical design | Egypt | 2020 |
| Al Naser Golden Tower | Full MEP design | Egypt | 2020 |
| US Embassy – MEP | Full MEP design | Cairo, Egypt | 2020 |
| Denmark Embassy | Full MEP design | Cairo, Egypt | 2020 |
| Borg El-Arab Airport – MEP | HVAC + CFD analysis | Alexandria, Egypt | 2020 |
| Zitona Hospital | Full MEP design | Egypt | 2020 |
| Adel Hussein Mall | HVAC + CFD analysis | Egypt | 2020 |
| Smart Power Sadat City Factory | Electrical design | Sadat City, Egypt | 2020 |
| Haleem Hospital | Full MEP design | Egypt | 2019 |
| Asuit Hospital | Full MEP design | Assiut, Egypt | 2019 |
| HEMPEL Solvent Factory | Electrical design | Egypt | 2019 |
| City Square – Al-Rehab | Full MEP design | Al-Rehab, Egypt | 2019 |
| Naghi Office Tower | Full MEP design | Jeddah, Saudi Arabia | 2018 |
| Ghazi Abbar Logistics Hub | Electrical design | Saudi Arabia | 2018 |
| Al-Ryad Hospital | Full MEP design | Egypt | 2018 |
| Rikaz Compound | Full MEP design | Al-Khobar, Saudi Arabia | 2017 |
| Al-Azhar University Hospital | Full MEP design | Cairo, Egypt | 2017 |
| Agoza Hospital | Full MEP design | Cairo, Egypt | 2017 |
| Sage & Butter Restaurant | HVAC + CFD analysis | Kuwait City, Kuwait | 2017 |
| Domiat Hospital | Full MEP design | Damietta, Egypt | 2016 |
| Al-Sayad Mall | HVAC + CFD analysis | Egypt | 2016 |
| Otakoy Restaurant | HVAC + CFD analysis | Kuwait City, Kuwait | 2016 |
| Cinnabon – Port Said | HVAC + CFD analysis | Port Said, Egypt | 2016 |
| Chamber of Commerce | Full MEP design | Egypt | 2016 |
| Bella Mall | HVAC + CFD analysis | Doha, Qatar | 2015 |
| International School – Extension Building | Full MEP design | Jeddah, Saudi Arabia | 2015 |
| Gallaria Mall | HVAC + CFD analysis | Egypt | 2015 |
| Jeddah Mall | HVAC + CFD analysis | Jeddah, Saudi Arabia | 2014 |
| Safwa Hotel | HVAC + CFD analysis | Tripoli, Libya | 2014 |
| Eleman Factory | Electrical design | Saudi Arabia | 2014 |
| OM Omar Mosque | Full MEP design | Saudi Arabia | 2013 |
| Alqueeque School | Full MEP design | Saudi Arabia | 2013 |
| Nursing Building – Sulaimaniyah | Full MEP design | Sulaimaniyah, Iraq | 2013 |
| King Abdullah Port – Phase 1A/1B | Full MEP design | Jeddah, Saudi Arabia | 2012 |
| El-Hamra Land Square | Full MEP design | Saudi Arabia | 2012 |
| IV Solutions Pharma Plant | Full MEP design | Sulaimaniyah, Iraq | 2012 |
| Administration Building – Kirkuk | Full MEP design | Kirkuk, Iraq | 2012 |
| Rank Mall | HVAC + CFD analysis | Sulaimaniyah, Iraq | 2012 |
| El-Ahly Bank – Sohag Branch | HVAC + CFD analysis | Sohag, Egypt | 2012 |
| CIB Bank – Emerald Mall | Electrical design | New Cairo, Egypt | 2012 |
| CIB Bank – Meeting Point | Electrical design | Cairo, Egypt | 2012 |
We begin by understanding client requirements, studying the project, and analyzing technical needs, then preparing designs, execution plans, and timelines to ensure a clear vision from the outset.
We execute works to the highest standards of quality and safety, with precise management of resources and schedules and continuous engineering supervision to meet project objectives.
We review and test all works prior to handover, providing the required technical documentation along with ongoing support and follow-up to sustain performance and ensure client satisfaction.